Heating systems under the overhaul program will be replaced until September 1
[ad_1]
In the summer, the city authorities are actively repairing heating systems in apartment buildings. This is due to the fact that as much as possible to do in the warm season, when there is no heating season.
Today, the Deputy Mayor of Moscow in the Moscow Government, Pyotr Biryukov, announced that all the work begun to replace the in-house heating systems during the overhaul of apartment buildings will be completed by September 1. This is supposed to be done to ensure the readiness of these houses for the autumn-winter period.
As part of the overhaul, such work is now underway in almost one and a half thousand apartment buildings. During the overhaul, worn-out pipelines, valves, supporting structures, various connecting elements, radiators and convectors in apartments and common areas are replaced. After the work is completed, a comprehensive pressure test of the system will take place.
This year, during the overhaul, only domestic materials are used that meet all the requirements of reliability and durability. In particular, when replacing the central heating system, Russian bimetallic radiators are installed, which have high energy efficiency rates.
Mona Platonova
[ad_2]
Source link